The short answer
Often yes. Paving, sealcoating and repair can usually be phased by section so part of the lot stays open while another part is worked on. How much stays open depends on the property, the type of work and the access that must be kept.
How phasing works
The lot is divided into sections. One section is closed, worked on and reopened once the pavement is ready, then the next section is closed. The number of sections depends on the layout, and a lot with several entrances is easier to phase than one with a single entrance.
What to plan before work starts
- Tenant and customer hours: which hours need parking and access.
- Deliveries: when trucks arrive and where they need to go.
- Entrances and drive lanes: which must stay open and which can close.
- Accessible parking and fire lanes: keep access available, and plan where temporary accessible stalls go.
- Notice: how and when tenants, customers and residents are told, and where signs and barricades go.
- Weather: summer heat and monsoon storms can move dates, so agree how delays are handled.
What to tell people
Tell tenants or residents the dates, the areas that will be closed, where to park instead and who to call with questions. Signs on site help on the day, and an email or letter ahead of time helps everyone plan.
When a full closure makes sense
Some work is faster or better done with a whole lot or area closed, for example a small lot with a single entrance or a drive lane that carries all traffic. A contractor can tell you when closing is the better choice and how long it would last.
If you want work phased around your tenants, request a free estimate and tell us how the property operates. See also our retail center page.