Why the RFP matters
When contractors are given loose descriptions, they price different jobs, and the totals cannot be compared. A clear request makes the differences between bids about the contractor, not about the scope.
What to include
- Property details: address, property type, approximate lot size or a site plan, and any photos you have.
- Scope by area: describe each area (drive lanes, parking, truck courts) and the work you want in it.
- Options to price separately: ask for repair, sealcoating, mill and overlay and replacement as separate options, if you are weighing them.
- Included items: crack sealing, repairs before sealcoating, striping, ADA stalls and signs, wheel stops, and cleanup.
- Access and phasing: tenant hours, deliveries, events, the number of sections the lot can be divided into and any areas that must stay open.
- Schedule: the earliest and latest dates, and any seasonal constraints such as monsoon.
- Requirements for bidders: Arizona contractor license, a certificate of insurance and references on similar properties.
- Submission details: deadline, how to submit questions, and who to contact on site.
How to compare the bids
Line up the scopes first, then compare the totals. Look at asphalt thickness, base work, what is included, who performs each part of the work, and how phasing and cleanup are handled. Our hiring guide has a checklist.
A sample structure
Property: [name, address, type] Areas and work: [area by area] Options to price separately: [repair, seal, overlay, replacement] Includes: [crack sealing, striping, ADA, cleanup] Access and phasing: [hours, sections, deliveries] Schedule: [dates] Bidders must provide: [license, insurance, references]
If you are building an RFP for a property, send us the details and we will give you a written scope you can use as a reference when comparing bids.